Sealants Project

Glacier Middle School – Buckley, WA

Back to Projects


Pecora 890NST was recently applied to all brick to brick and metal to brick window perimeters of the Glacier Middle School project in Buckley, Washington. According to the general contractor on the job, Neeley Construction, the Glacier Middle School project consists of the construction of a new steel-framed 2-story building. A number of existing structures were demolished to make room for the new building. In addition, the scope of work also includes the current Physical Education Building to be retained and remodeled. 890NST was installed to ensure a complete weatherseal around the windows of the building. The product was chosen due to its primerless adhesion and non-staining capabilities. Pecora’s proprietary complete line of Non-Staining Technology Silicones guarantee the appearance and integrity of the building will remain stain free and prevent residue rundown for many years to come.

 


Pecora Calculator
Coatings
Sealants
Air Barrier
Enter Data:
Select Product


Required Dry Mil Coverage (mils)


Total Sq. Ft. Of Project


Estimated Waste (%):
Coverage Rate(Wet):
Sq. Ft./Gallon

Mills


Materials Required
Gallons




To use: Enter values and press "Update" to recalculate. These calculators also update when you tab to the next field or click elsewhere in the page.