Sealant Application for New Construction


Sealant Application for New Construction

Placing the Sealant

  • Use sealants that have not reached the end of their package shelf-life.
Sealant mixing in process smaller
  • Mix multi-component sealants properly. Do not entrain air or over or under mix components.
  • Tape the outside edge of joints if necessary to prevent overlapping sealant application.
  • Gun the sealant into the joint at constant pressure and flow.
  • Tool the sealant surface to completely fill the joint opening with sealant thereby wetting the entire substrate adhesion area.
  • Check the quality of the work frequently and keep samples.

Click here for next page
Click here to return to New Construction Application Guide

Distributor/Sales Rep Locator

Distributor
Sales Rep


Technical Services

Let our tech service experts help make your project a success.

Click or call (800) 523-6688.

Pecora Calculator

Calculate material needs for Coatings, Sealants and Air Barriers.

Launch Calculator




Pecora Calculator
Coatings
Sealants
Air Barrier
Enter Data:
Select Product


Required Dry Mil Coverage (mils)


Total Sq. Ft. Of Project


Estimated Waste (%):
Coverage Rate(Wet):
Sq. Ft./Gallon

Mills


Materials Required
Gallons




To use: Enter values and press "Update" to recalculate. These calculators also update when you tab to the next field or click elsewhere in the page.